PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed electrical conduit at the steel column Facing West (800x600).jpg Installed shear studs at the lower roof Facing East (800x600).jpg Installed shear studs at the lower roof Facing South-West (800x600).jpg Welding miscllaneous steel plates at the lower roof Facing East (800x600).jpg Welding the tube steel at the Servery Room Facing North-East (800x600).jpg
Previous page Welding the tube steel at the Servery Room Facing North-East (800x600)
Welding the tube steel at the Servery Room Facing North-East (800x600)